Indonesia is a tropical country with two seasons-rainfall and drought. Moreover, Indonesia's geography always receives rainfall throughout the year, giving it a high rainfall of 2000-3000 mm per year. Water use as a source of energy has long been used to power hydroelectric (water plta). Hydroelectric plants tap into the potential energy and water-kinetic energy converged into angular power by water turbines. Water is also one of the most readily available sources of energy. Particularly in the west Java, it is seen at this time, as the season is already beginning. The use of hydroelectric power to meet the needs of electricity sources and, given the tiny new and renewable energy potential, would create hydroelectric power plants to optimize the use of new and renewable energy potential. In this article the authors will create a minuscule plant with easy materials so that the reader can build his own power plant without charging much money.

References

A. B. P. Anggun, N. Yuliana, G. Heru. “Perancangan Sistem Elektrikal Pada Alat Pengisian Minyak Rem Otomatis Mobil”. Jurnal Elemen, vol. 6, no. 1, 2019.

E. C. Rezzy, and C. E. Puti. ”Simulasi Kalkulator Energi Baru Terbarukan (EBT) Guna Memenuhi Ketahanan Energi di Indonesia”. Statistika, vol. 16, no. 2, pp 77–88, 2016.

H. H. Diqi. Dkk. “Pengembangan Media Pembelajaran Pembangkit Listrik Tenaga Air”. Jurnal Pendidikan Teknik Elektro Undiksha, vol. 9, no. 2. 2020.

I, Nuriskasari, dkk. “Rancang Bangun Pembangkit Listrik Tenaga Air Gambut Menggunakan Logam Bekas Sebagai Elektroda”. Jurnal Austenit, vol. 13, no. 1. 2021.

Morong, J. Y. (2016). Rancang Bangun Kincir Air Irigasi Sebagai Pembangkit Listrik di Desa Talawaan. Tugas Akhir. Politeknik Negeri Manado.

Salim, R. (2013). Rancang Bangun Pompa Air Dengan Tenaga Penggerak Kincir Air. Tugas Ahkir. Politeknik Negeri Jember.

Syafirulloh, M. (2021). Pengaruh Rasio Pulley 0’592: 1 Inchi Terhadap Beban Maksimal Pemakaian Mesin Listrik Portabel Ramah Lingkungan. Skripsi. Politeknik Harapan Bersama.

Taufiquraahman, Asa, and W. Jaka. ”Overview Potensi Perkembangan Pemanfataan Energi Air di Indonesia”. Jurnal Energi Baru & Terbarukan, vol. 1, no. 3, pp. 124–134, 2020.

Winasis. “Optimasi Operasi Pembangkit Listrik Tenaga Air (PLTA) Menggunakan Linier Programming Dengan Batasan Ketersediaan Air”. Dinamika Rekayasa, vol. 9, no. 2. 2013.

Y. A. Dewangga. “Pengaruh Jumlah Sudu Turbin Air Terhadap Kinerja Generator Pembangkit Listrik Tenaga Air”. Jurnal Teknik Elektro, vol. 11, no. 1. 2022.

Published
2023-07-16
How to Cite
Cahyadi, F., & Latifa, U. (2023). Pembuatan Alat Pembangkit Listrik Tenga Air (Plta) Mini Menggunakan Bahan Daur Ulang. Jurnal Ilmiah Wahana Pendidikan, 9(13), 258-263. https://doi.org/10.5281/zenodo.8151056